Sector 04 of 10 · Why Guinea?
Infrastructure & logistics
Ports, corridors and connectivity to regional markets. Logistics demand has outpaced forecasts: the volumes expected at Conakry port for 2030 were reached as early as 2025.
Pillar III of Simandou 2040
2,900 km of motorways, 2,500 km of rail, 95% digital coverage
The “infrastructure, transport and technology” pillar, whose first wave was launched on 25 July 2026, opens the Plan’s widest field of opportunity: ports, corridors, rail, power and logistics.
- handled at Conakry port in 2025 (≈ 300,000 in 2023)
- 416,892 TEU
- of double-track Trans-Guinean railway, Simandou–Morebaya
- ≈ 650 km
- passengers at Conakry airport in 2025 (+21.4%)
- 957,820
- Conakry–Bamako: Mali’s nearest port
- 991 km
Guinéenews
Railmarket · Capmad
Guinéenews
Logistafrica
Ports
Three port platforms expanding
| Platform | Situation | Open projects |
|---|---|---|
| Port of Conakry | 416,892 TEU handled in 2025; over 500,000 targeted in 2026 | Container terminal extension (EUR 350 m, capacity doubled); Kagbélen dry port |
| Morebaya port (Forécariah) | Deep-water ore port of the Simandou system, designed as “multi-user” | Ramp-up towards 120 Mt/yr; port and maritime services |
| New platforms (wave 1) | Announced by the Ministry of Transport | Dobali industrial-port complex; Benty logistics centre; handling equipment |
Port of Conakry
- Situation
- 416,892 TEU handled in 2025; over 500,000 targeted in 2026
- Open projects
- Container terminal extension (EUR 350 m, capacity doubled); Kagbélen dry port
Morebaya port (Forécariah)
- Situation
- Deep-water ore port of the Simandou system, designed as “multi-user”
- Open projects
- Ramp-up towards 120 Mt/yr; port and maritime services
New platforms (wave 1)
- Situation
- Announced by the Ministry of Transport
- Open projects
- Dobali industrial-port complex; Benty logistics centre; handling equipment
Rail, road, air and corridors
Linking the Atlantic to the Sahel
Trans-Guinean railway : 650 km of double track, 12 stations, 206 bridges, 4 tunnels (27.6 km); multi-use infrastructure open to other operators; first passenger trains announced for 2027.
New lines planned : Kaloum–Kouria, Kouria–Morebaya, Kankan–Kérouané.
Ahmed Sékou Touré airport : capacity raised from 0.5 to 3 million passengers a year; 9,290 t of freight in 2025 (+85.3%).
Regional airports : Kankan, Labé and Beyla under construction; Faranah and Nzérékoré under study.
Corridors to regional markets
| Market | Corridor | Progress |
|---|---|---|
| Mali | Conakry–Kankan–Bamako | Transit agreements of January 2026: dedicated port areas, 10 ha ceded in Conakry, 20 ha allocated to Mali in Kankan |
| Senegal | Labé–Mali–Kédougou | ≈ EUR 140 m released; AfDB loan of USD 80.93 m |
| Burkina Faso | Conakry–Ouagadougou | Cooperation protocol; liaison office planned at the port |
| Sierra Leone, Liberia, Guinea-Bissau | ECOWAS coastal road | 483 km in Guinea, from the Bissau-Guinean border to Pamelap; Conakry–Freetown sea link |
Mali
- Corridor
- Conakry–Kankan–Bamako
- Progress
- Transit agreements of January 2026: dedicated port areas, 10 ha ceded in Conakry, 20 ha allocated to Mali in Kankan
Senegal
- Corridor
- Labé–Mali–Kédougou
- Progress
- ≈ EUR 140 m released; AfDB loan of USD 80.93 m
Burkina Faso
- Corridor
- Conakry–Ouagadougou
- Progress
- Cooperation protocol; liaison office planned at the port
Sierra Leone, Liberia, Guinea-Bissau
- Corridor
- ECOWAS coastal road
- Progress
- 483 km in Guinea, from the Bissau-Guinean border to Pamelap; Conakry–Freetown sea link
Conakry’s share of Malian traffic rose from under 5% to as much as 20% in 2022.
Where to invest
Six families of opportunities backed by the Plan
All are accessible through PPPs, concessions or direct investment.
| Sector | Projects and needs | Modalities |
|---|---|---|
| Ports and logistics | Conakry terminal extension, Dobali, Benty, dry ports, warehousing | Concession, PPP, subcontracting |
| Rail and mobility | Kaloum–Kouria, Kouria–Morebaya, Kankan–Kérouané lines; maintenance; rolling stock | PPP, operating contracts |
| Power | Hydropower, solar, transmission and distribution | Independent producer, PPP, blended finance |
| Mineral processing | 5 alumina refineries targeted by 2030, 3 under development; steel mill or pellet plant under study | Joint venture, local content |
| Agribusiness | Agro-industrial zones, irrigation, mechanisation, fisheries | Direct investment, PPP |
| Services and finance | Construction, digital, port services, capital markets | Bonds, sukuk, SME guarantees |
Ports and logistics
- Projects and needs
- Conakry terminal extension, Dobali, Benty, dry ports, warehousing
- Modalities
- Concession, PPP, subcontracting
Rail and mobility
- Projects and needs
- Kaloum–Kouria, Kouria–Morebaya, Kankan–Kérouané lines; maintenance; rolling stock
- Modalities
- PPP, operating contracts
Power
- Projects and needs
- Hydropower, solar, transmission and distribution
- Modalities
- Independent producer, PPP, blended finance
Mineral processing
- Projects and needs
- 5 alumina refineries targeted by 2030, 3 under development; steel mill or pellet plant under study
- Modalities
- Joint venture, local content
Agribusiness
- Projects and needs
- Agro-industrial zones, irrigation, mechanisation, fisheries
- Modalities
- Direct investment, PPP
Services and finance
- Projects and needs
- Construction, digital, port services, capital markets
- Modalities
- Bonds, sukuk, SME guarantees
Local content: the Trans-Guinean railway company awarded its first rail maintenance contract to a Guinean firm.
Risks and safeguards
A clear-eyed reading, explicit control mechanisms
| Point of attention | Safeguard or response |
|---|---|
| Greater dependence on mining exports | Legal priority to local processing and diversification; sovereign fund fed by mining revenue |
| Port congestion in 2025, as traffic grew faster than forecast | Terminal extension (EUR 350 m), Kagbélen dry port, new logistics zones |
| Still-limited access to electricity | Regional interconnections, opening to independent producers |
| Debt sustainability | Any borrowing under the Plan is subject to debt sustainability (art. 5 of the Plan Law) |
| Governance and transparency | Court of Auditors oversight; annual reports to Parliament; publication of projects, amounts and contract awards (art. 16 of the Programme Law) |
Greater dependence on mining exports
- Safeguard or response
- Legal priority to local processing and diversification; sovereign fund fed by mining revenue
Port congestion in 2025, as traffic grew faster than forecast
- Safeguard or response
- Terminal extension (EUR 350 m), Kagbélen dry port, new logistics zones
Still-limited access to electricity
- Safeguard or response
- Regional interconnections, opening to independent producers
Debt sustainability
- Safeguard or response
- Any borrowing under the Plan is subject to debt sustainability (art. 5 of the Plan Law)
Governance and transparency
- Safeguard or response
- Court of Auditors oversight; annual reports to Parliament; publication of projects, amounts and contract awards (art. 16 of the Programme Law)
At the Forum
Deal room : mature Simandou 2040 projects, presented with their public and private sponsors.
Direct access to decision-makers : line ministries, the Simandou 2040 Delivery Unit, public agencies, infrastructure operators.
Site visits : Morebaya port, Kagbélen dry port, Trans-Guinean corridor (to be confirmed).
Follow-up after the Forum : economic intelligence, due diligence and a commitments dashboard.
Sources
- —Official Journal — Simandou 2040 special issue (31 March 2026)
- —Logistafrica — pillar 3 transport projects (July 2026)
- —Guinéenews — Conakry Terminal: 416,892 TEU in 2025; airport 2025 results
- —AllAfrica — Mali–Guinea transit agreements (Feb. 2026)
- —Railmarket, Capmad — Trans-Guinean railway and Morebaya port
- —World Bank — regional energy projects (2025)
- —Bpifrance Assurance Export — Guinea country sheet (Dec. 2025)
The ten priority sectors
- 01Mining & value chainsBauxite, gold, Simandou iron ore: from extraction to local processing.
- 02Energy & transitionHydropower and solar for households, SMEs and industry.
- 03Agriculture & agribusinessFood sovereignty and processing of national production.
- 04Infrastructure & logisticsPorts, corridors and connectivity to regional markets.
- 05Digital, AI & innovationTechnology solutions and new business models.
- 06Human capital & jobsTraining aligned with economic needs and youth employment.
- 07Finance & investmentCapital markets, PPPs and risk-sharing mechanisms.
- 08Climate & resilienceSustainable economy and territorial adaptation.
- 09Mobility & diasporasDiaspora skills, networks and capital.
- 10Governance & integrationPeace, cooperation and African economic integration.
Public data as of late October 2026; projections are those of the institutions cited.
Invest in this sector, in Conakry, alongside the decision-makers.
Qualified projects, B2B and B2G meetings prepared in advance, public tracking of commitments after the Forum.