Skip to content
News

Sector 01 of 10 · Why Guinea?

Mining & value chains

Bauxite, gold, Simandou iron ore: from extraction to local processing. Guinea has set the rule of the game — value must now be created on Guinean soil.

The window

World’s leading bauxite exporter, a new global iron-ore hub

Three alumina refineries are under way, raw gold can no longer be exported without local refining, and Simandou’s partners must study a steel mill or a pellet plant.

of bauxite exported in 2025 (+25%)
182.8 Mt

Ministry of Mines

of probable bauxite reserves
7.4 bn t

Guinéenews

target capacity of the Simandou system
120 Mt/yr

SimFer · WCS

of gold exported in 2025
≈ 69.5 t

Ministry of Mines

The Simandou 2040 programme, enacted into law in March 2026, organises this transformation around 122 megaprojects and 36 reforms. The phase now opening is no longer only about mining majors: subcontracting, maintenance, refinery power, logistics and site services are creating a market for Guinean, African and international SMEs.

Three value chains

From first-stage processing to downstream industry

  • Bauxite

    Current position
    182.8 Mt exported in 2025 (+25%), world’s leading exporter; probable reserves of 7.4 bn t
    Processing under way
    Alumina refineries: SPIC (1.2 Mt/yr, end 2027), Winning Consortium Alumina Guinea (2028), Chalco at Boffa (works launched 13 June 2026). Target: 5 to 6 refineries, ≈ 7 Mt/yr by 2030
  • Iron ore – Simandou

    Current position
    First exports in November 2025; Trans-Guinean railway of about 650 km; target capacity of 120 Mt/yr
    Processing under way
    Mandatory study of a steel mill (500,000 t/yr) or a pellet plant (2 Mt/yr) within two years of first exports
  • Gold

    Current position
    ≈ 69.5 t exported in 2025 (19.9 t industrial, 49.6 t artisanal); Siguiri: 289,000 oz (+6%)
    Processing under way
    Ban on raw-gold exports (June 2026): refining must take place in Guinea
  • Bauxite. China took about 74% of Guinean volumes in 2025. Operators expect close to 200 Mt in 2026 and USD 1.2 bn in tax revenue, while the State manages volumes to support prices.

  • Simandou. The mine-rail-port system is operational: the Trans-Guinean railway has been fully in service since Q1 2026 and Morebaya port is due to be fully commissioned in Q1 2027. Close to USD 20 bn has been mobilised, and SimFer paid USD 210.5 m to Guinean suppliers in H1 2026 alone.

  • Gold. The raw-gold export ban opens a market for refining, certification and traceability.

Where to invest

The opportunity portfolio

The programme’s needs and the local-processing requirement point to five families of opportunities, open to foreign capital as well as to Guinean and diaspora entrepreneurs.

  • Mining and metallurgy

    Opportunities
    Alumina refineries, pellets and direct-reduced iron, steel mill, gold refining and certification
    Entry models
    FDI, joint ventures with the State, mining agreements
  • Infrastructure and logistics

    Opportunities
    Mining corridors turned into economic corridors, ports, logistics platforms, industrial zones
    Entry models
    PPP, BOT, concessions
  • Power for sites

    Opportunities
    Refineries and a possible steel mill will need hundreds of MW: Amaria, Grand Kinkon (280 MW) and other identified sites
    Entry models
    IPP, BOT, BOO, OMVG and OMVS interconnections
  • Agribusiness

    Opportunities
    Irrigation, mechanisation, processing, cold chain, fisheries along the corridors
    Entry models
    FDI, aggregation, value-chain finance
  • Services and skills

    Opportunities
    Mining subcontracting, maintenance, technical training (Simandou Academy), finance, digital
    Entry models
    Local content, partnerships, joint ventures

The ECOWAS Bank for Investment and Development (EBID) has said it is ready to raise capital for the programme’s mature projects; the State is studying a USD 500 m sukuk.

Investing with clear eyes

Points of attention and current responses

Serious investors already know these risks; naming them and showing the responses under way strengthens the Forum’s credibility.

  • State reassertion over the mining sector: 86 permits revoked in May 2025; an ICSID case filed by a former operator

    Current response
    Priority to operators committed to processing; new agreements signed (Nimba Mining Company, August 2026)
  • Bauxite volume management announced in 2026

    Current response
    Aim of supporting prices and revenue; quota visibility still to be clarified for operators
  • Power deficit: 32% of households connected

    Current response
    Hydropower programme, regional interconnections, opening to independent producers
  • High dependence on mining exports

    Current response
    Simandou 2040, sovereign fund, Delivery Unit; S&P rating on positive outlook

At the Forum

Where commitments become projects

  • High-level plenaries : with the Government, the Simandou Strategic Committee, mining operators and lenders.

  • “Mining & value chains” session : plus the Mining & processing pavilion: refineries, subcontracting, local content.

  • Deal Room and B2B meetings : around mature Simandou 2040 projects, prepared and qualified in advance.

  • Proposed site visits : Boké basin, Simandou corridor, Morebaya port (to be confirmed).

Sources
  • —Ministry of Mines and Geology — Statistical bulletin Q3 2025
  • —INS — Preliminary results of the 4th census (RGPH-4)
  • —Official Journal — Simandou 2040 special issue (31 March 2026)
  • —French Treasury — West Africa outlook, IMF WEO April 2026
  • —Rio Tinto SimFer — Q1 2026 update
  • —invest.gov.gn — Energy and agriculture fact sheets
  • —Financial Afrik — Bauxite exports 2025; third alumina refinery
  • —Apanews — Simandou 2040 laws and GDP rebasing
  • —Coface, AllAfrica, Capmad, Guinéenews, Ecofin

Invest in this sector, in Conakry, alongside the decision-makers.

Qualified projects, B2B and B2G meetings prepared in advance, public tracking of commitments after the Forum.